Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 8 results ...

Doğan, S Z, Arditi, D and Murat Günaydin, H (2008) Using Decision Trees for Determining Attribute Weights in a Case-Based Model of Early Cost Prediction. Journal of Construction Engineering and Management, 134(02), 146–52.

Ergen, E and Akinci, B (2008) Formalization of the Flow of Component-Related Information in Precast Concrete Supply Chains. Journal of Construction Engineering and Management, 134(02), 112–21.

Eriksson, P E (2008) Procurement Effects on Coopetition in Client-Contractor Relationships. Journal of Construction Engineering and Management, 134(02), 103–11.

Isaac, S and Navon, R (2008) Feasibility Study of an Automated Tool for Identifying the Implications of Changes in Construction Projects. Journal of Construction Engineering and Management, 134(02), 139–45.

Leung, M, Zhang, H and Skitmore, M (2008) Effects of Organizational Supports on the Stress of Construction Estimation Participants. Journal of Construction Engineering and Management, 134(02), 84–93.

Xiong, Y and Kuang, Y (2008) Applying an Ant Colony Optimization Algorithm-Based Multiobjective Approach for Time–Cost Trade-Off. Journal of Construction Engineering and Management, 134(02), 153–6.

Ye, S and Liu, Y (2008) Study on Development Patterns of Infrastructure Projects. Journal of Construction Engineering and Management, 134(02), 94–102.

Yu, A T W, Shen, Q, Kelly, J and Hunter, K (2008) Comparative Study of the Variables in Construction Project Briefing/Architectural Programming. Journal of Construction Engineering and Management, 134(02), 122–38.